How much does a bathroom remodel cost in Columbus, Ohio?
Short answer, with no form to fill in first: a bathroom refresh starts at $4,849, a tub-to-shower conversion starts at $11,950, and a full remodel starts at $15,679 β installed, in Central Ohio, in 2026.
Last updated August 2026 Β· Prices are the same ones on our Estimate Builder, which is the tool we quote from.
Most remodeling companies will not answer this question until someone has been in your living room for two hours. We publish the numbers instead. This page explains what each price covers, what moves it up or down, and β the part nobody explains β why the averages you find elsewhere online are so much lower than a real installed quote.
Our published starting prices
| Project | Starts at | What it covers |
|---|---|---|
| Bathroom Refresh | $4,849 | Updating what is already there β vanity, fixtures, hardware, finishes β without moving plumbing or opening walls. |
| Tub-to-Shower Conversion | $11,950 | Removing the tub and building a walk-in shower in its place: bath demolition and haul-away, valve and drain rough adjustments, the new shower system, protection and cleanup. |
| Full Bathroom Remodel | $15,679 | A full gut: drywall, electrical package, rough plumbing, permits and inspections, and everything that goes back in. |
These are starting prices for the smallest version of each job. The Estimate Builder takes about two minutes and gives you a real range for your bathroom and the products you actually want.
Why do online averages say a tub-to-shower conversion costs about $3,000?
Because they are measuring a different job, and it is worth understanding the difference before you compare quotes.
National cost aggregators pool everything filed under "tub to shower conversion." That bucket is dominated by the cheapest version of the work: a basic acrylic pan and wall kit dropped into the existing tub footprint, reusing the existing valve and drain, no grab bars, no seat, no waterproofing membrane, often no permit, and frequently no written warranty. That job is real, and for some bathrooms it is genuinely the right call. It is not the job we do.
A low number can also mean labor only, with materials billed separately, or a quote that has not yet met your actual walls. The gap between an advertised average and a final invoice is where most remodeling complaints come from.
The honest comparison to make is not price against price. It is scope against scope. Ask any contractor you are considering: is the permit included? Is there a waterproofing membrane behind the walls? Are grab bars and a seat in the price or added later? What is the warranty, in writing, and how long? Our answers are on this page because they do not change depending on who is asking.
What is included in every project, at every price
- Demolition and haul-away
- Permits where required
- Floor protection and dust barriers
- Professional cleanings along the way
- Our 5-year workmanship guarantee
None of those are line items you will find added at the end. They are in the published price.
What moves the price up or down
Things that add cost
- Moving plumbing. Relocating a drain or a valve means opening walls or floor, and it is the single biggest swing in most bathrooms.
- Tile instead of a solid-surface system. More labor, more time, more variables behind the wall.
- Bathroom size. A larger footprint is more material and more hours.
- What we find behind the wall. Older Central Ohio houses β the 1950s and 60s stock across the east and south sides especially β sometimes hide water damage or galvanized supply lines. We tell you before we proceed, not after.
- Higher-end fixtures. Your choice, priced transparently in the Estimate Builder so you can see what each upgrade does to your total.
Things that keep cost down
- Keeping the existing layout. Same footprint, same plumbing locations.
- A refresh instead of a remodel when the bones are sound and it is really the finishes you dislike.
- Doing it once. Staging a bathroom in phases usually costs more in total than doing it in one go.
Is a walk-in shower worth it?
For safety, the case is straightforward: a standard tub wall is around fifteen inches, and stepping over it is where bathroom falls happen. A low-threshold shower with grab bars and a built-in seat removes that daily obstacle, and it is the most requested bathroom upgrade we are asked for. For resale, a midrange bathroom remodel is consistently among the stronger interior returns β though if the reason you are considering it is that getting into the tub has become a problem, that is the reason that matters.
Common questions
Do you charge for an estimate?
No. The Estimate Builder is free and needs no phone number to use, and an in-home consultation is free.
How long does a tub-to-shower conversion take?
Most conversions are a matter of days rather than weeks. Your projected start window is confirmed at your consultation.
How does payment work?
40% deposit to schedule and order materials, and the remaining 60% at substantial completion. Your 5-year workmanship guarantee starts the day we finish.
Do you pull permits?
Yes, where the work requires one β it is included in the price. Permit records in Columbus are public, so you can look up any contractor you are considering, including us, before you sign anything.
What areas do you serve?
Central Ohio, from Westerville out roughly forty miles β Columbus and the surrounding suburbs including Gahanna, Worthington, Clintonville, Grove City, Groveport, Hilliard, Dublin, Powell, Upper Arlington, New Albany and Pickerington.
Why do you publish prices when other companies won't?
Because the number is going to come up eventually, and there is no version of this where finding it out sooner is worse for you. It also means the people who call us already know roughly what the work costs, which makes for a much shorter and more honest conversation.
See your actual price in about two minutes
Pick your project, choose real products with real model numbers, and watch the number move. No phone number required, and nobody will call unless you ask.